水穩(wěn)砼底基層混合料拌合以及運(yùn)輸內(nèi)容

來源:http://m.id888.com.cn/ 日期:2023-03-10
底基層混合料拌合
Mixing of subbase mixture
根據(jù)批復(fù)的濟(jì)南水穩(wěn)砼底基層配合比確定各種材料的比例,采用拌合機(jī)進(jìn)行拌合。拌合前先檢測(cè)場(chǎng)內(nèi)各規(guī)格集料的含水率,并計(jì)算當(dāng)天的施工配合比,實(shí)際生產(chǎn)配合比的拌和含水率應(yīng)較佳含水率大于0.5%~1%,以補(bǔ)償攤鋪及碾壓過程中的水分損失。
The proportion of various materials shall be determined according to the approved mix proportion of Jinan water stabilized concrete subbase, and the mixer shall be used for mixing. Before mixing, the moisture content of aggregates of various specifications in the site shall be tested first, and the construction mix proportion of the day shall be calculated. The actual production mix proportion shall have a better moisture content of more than 0.5%~1% to compensate for the moisture loss during paving and rolling.
拌和站現(xiàn)場(chǎng)安排兩名試驗(yàn)人員隨時(shí)進(jìn)行檢測(cè)。每天開機(jī)后當(dāng)集料輸送帶上的集料達(dá)到正常狀態(tài)時(shí),立即從集料帶上截取一段集料進(jìn)行級(jí)配試驗(yàn),檢查施工級(jí)配配合比是否滿足要求。
Two test personnel shall be arranged at the mixing plant site to conduct inspection at any time. When the aggregate on the aggregate conveyor belt reaches the normal state after starting every day, immediately cut a section of aggregate from the aggregate belt for grading test to check whether the construction grading mix ratio meets the requirements.
正式生產(chǎn)之后,每1-2小時(shí)檢查一次拌和情況,檢驗(yàn)其配合比、含水率、水泥劑量,發(fā)現(xiàn)異常時(shí)及時(shí)調(diào)整或停止生產(chǎn)。
After formal production, check the mixing condition every 1-2 hours, check the mix ratio, water content and cement dosage, and timely adjust or stop production in case of any abnormality.
拌合時(shí)水泥實(shí)際用量要比設(shè)計(jì)用量稍有增加,且增加值不超過0.5%,以抵消施工強(qiáng)度離散性比設(shè)計(jì)強(qiáng)度離散性增大的影響。加水量的計(jì)量采用流量計(jì)的方式,且流量數(shù)值要在中央控制室的控制面板上顯示。
The actual cement consumption during mixing is slightly higher than the design consumption, and the increase value is not more than 0.5%, to offset the impact of the increase in the construction strength dispersion than the design strength dispersion. The metering of water addition shall adopt the flow meter, and the flow value shall be displayed on the control panel in the central control room.
濟(jì)南水穩(wěn)砼
在每天施工結(jié)束后要清理干凈,檢查并進(jìn)行適當(dāng)維護(hù),尤其要注意避免水泥結(jié)塊而堵塞水泥下料口,防止生產(chǎn)過程中混合料水泥劑量偏低,影響基層強(qiáng)度。
Clean up, inspect and maintain properly after the construction every day, especially pay attention to avoid cement caking and blocking the cement blanking port, and prevent the low cement dosage of the mixture in the production process from affecting the strength of the base course.
底基層混合料運(yùn)輸
Transportation of subbase mixture
運(yùn)輸采用大噸位自卸汽車,汽車的尾部尺寸符合攤鋪機(jī)喂料斗的要求,運(yùn)輸能力要與拌合樓產(chǎn)量和現(xiàn)場(chǎng)攤鋪能力相匹配。運(yùn)輸車輛在裝料時(shí)應(yīng)派專人指揮前后移動(dòng),先裝前部,再裝后部,后再裝中間,防止出現(xiàn)混合料離析現(xiàn)象。
The large-tonnage dump truck shall be used for transportation. The tail size of the truck shall meet the requirements of the paver's hopper. The transportation capacity shall match the production of the mixing plant and the on-site paving capacity. When loading, transport vehicles shall be directed to move forward and backward by specially-assigned person. The front part shall be loaded first, then the rear part, and then the middle part to prevent mixture segregation.
混合料運(yùn)輸車裝料前應(yīng)清理干凈,車廂不得有雜物。運(yùn)輸時(shí)采用苫布全封閉覆蓋混合料,以防止水分蒸發(fā)及沿途污染。
The mixture transport vehicle shall be cleaned before loading, and the carriage shall be free of sundries. The mixture shall be covered with tarpaulin completely during transportation to prevent water evaporation and pollution along the way.
車輛按規(guī)定線路行駛,不得在養(yǎng)生期間的鋪筑層行使,車輛行走速度不宜太快,保證運(yùn)輸安全。混合料要盡快運(yùn)至鋪裝現(xiàn)場(chǎng),保證及時(shí)、連續(xù)和安全。車輛倒車時(shí)在攤鋪機(jī)前30cm處停住,卸料時(shí)掛空擋,注意不要撞擊攤鋪機(jī),不要把料卸在攤鋪機(jī)外面。
The vehicle shall be driven according to the specified route and shall not be driven on the pavement during curing. The vehicle shall not travel too fast to ensure transportation safety. The mixture shall be transported to the paving site as soon as possible to ensure timely, continuous and safe. When backing up, the vehicle shall stop 30cm in front of the paver. When unloading, the vehicle shall be in neutral gear. Pay attention not to hit the paver, and do not unload the material outside the paver.
在進(jìn)入施工區(qū)域的路基坡道口鋪設(shè)草簾及土工布,防止運(yùn)輸車輛將泥帶入工作區(qū)域,同時(shí)安排專人隨時(shí)打掃車輪印記,確保下承層及已鋪筑的下基層面干凈。還有什么產(chǎn)品事項(xiàng)了解可以隨時(shí)來我們網(wǎng)站http://m.id888.com.cn進(jìn)行咨詢!
The grass curtain and geotextile shall be laid at the roadbed slope crossing entering the construction area to prevent the transport vehicles from bringing mud into the working area. At the same time, special personnel shall be arranged to clean the wheel marks at any time to ensure that the lower bearing layer and the paved lower base surface are clean. If there are any other product matters, please come to our website at any time http://m.id888.com.cn Consult!
  • 上一條:工程中的水穩(wěn)料有什么事項(xiàng)需了解?
  • 下一條:怎么挑選靠譜的瀝青生產(chǎn)廠家?
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    国产美女人喷水在线观看 | 无码专区人妻视频在线| 捏胸吃奶吻胸免费视频大软件 | 午夜福利姬精品在线| 村妇嫖妓一区二区三区AV| 国产伦精品一区二区视频| 亚洲欧美日韩在线精品| 亚洲Aⅴ天堂Av天堂无码久久| 国产精品免费性爱视频不| 视频一区二区三区欧美国产剧情| 国产成人亚洲综合色婷秒播| 高清无码一区二区在线观看吞精| 亚洲影院麻豆视频| 国产AV乱码一区二区三区无卡顿| 任我橹精彩视频精品视频在线| 亚洲国产区男人本色vr| 东京热影音先锋中文| 久久国产青青视频| 中文字幕偷窥欧美人妻| 精品国产无码一区二区| 亚洲免费观看视频网站免费| 国产精品一本| 99久久99久久精品国产片果冻| 91天堂视频肉丝| 性Free 69| 性做久久久久久久久久久| 国产精品网址| 日韩一区二区三区夜色视频| A久久久久久| 精品人妻中文| 红桃av在线一区| 男人c女人高清视频| 欧美在线观看国产| 亚洲天堂无码人妻| 成人h视频在线看| 久久久久久精品成人| 天天操夜夜爽AV| 国产精品无码影视久久久久久久 | 欧美亚洲日韩精品一卡| 亚洲精品字幕免费观看| 自产精品视频在线视频最新|